• Completely tailor-made project
  • Securing the cleaning and maintenance of 2 dierent buildings facades
  • Securing the cleaning and maintenance of 13 courtyards
  • Requirements with very high standards by local regulations

Özet

Two Building Maintenance Units were the fastest and easiest way to clean all the external facades. To maintain internal courtyards, 20 sections of SafeAccess monorail have been installed for the suspension of the RopeClimber.The hoist does not require a big storage area and is powered by battery. It is easy to transport between the courtyards and it can access remote facade areas. Engineering calculations for both systems have been thoroughly evaluated and approved by SIRVE Institute – Seismic Protection Technologies.The BMUs have been designed and producedby FBA Gomyl.
gorsel
gorsel

The Results

  • 780m of SafeAccess rail for the maintenance of the courtyards.
  • 2 RopeClimber suspended from SafeAccess rail.
  • 2 Building Maintenance Units.
  • 650m of rail attached to the inner parapet for the BMUs.